17-2 GAS FIELD PROJECT - PROCESS & CHEMICAL
PROJECT DETAILS
Project Name: Lingshui (LS) 17-2 Gas Field Project
Project Type: Various – Oil & Gas – Downstream
Location: China
BACKGROUND
The subsea production system for the Lingshui 17-2 field consists of 11 horizontal subsea trees, four manifolds, topside and subsea control system and a vertical tie-in connection system. The work scope also includes more than 70 kilometers of static and dynamic umbilical’s, linking the subsea development to a new, semisubmersible offshore platform. Annual production of Lingshui 17-2 is estimated at 3.2 billion cubic meters (bcm), with maximum production likely to reach 3.39 bcm.
OBJECTIVE
To comply with the demanding nature of the requirements and provide a series of solutions fully in compliance with customer and project specifications.
SOLUTION
We supplied 19 x API610 OH2 Pumps and 4 x API610 VS6 Pumps:
2 x HZC 50–40–200 (API610 – OH2)
2 x HZC 80–50–250 (API610 – OH2)
2 x HZC 50–40–200 (API610 – OH2)
3 x HZC 80–50–250 (API610 – OH2)
2 x HZC 80–50–350 (API610 – OH2)
3 x HZC 80–50–250 (API610 – OH2)
2 x KVSL 200 x 150 KVSL/5 (API610 – VS6)
2 x KVSL 80 x 50 KVSL/6 (API610 – VS6)
2 x HZC 150–350 (API610 – OH2)
2 x HZC 350–600 (API610 – OH2)
1 x HZC 350–600 (API610 – OH2)
For commercial enquiries, please contact us at: